Tech Tip: Battery Discharge at High Temperatures

Tech Tip: Battery Discharge at High Temperatures

Some 1998-2001 1.8L Kia Sephia vehicles built between October 1997 and May 2001, and some 2000-2004 1.8L Spectra vehicles built between February 2000 and March 2004, may exhibit battery discharge when operated in high ambient temperatures for extended periods of time at low speeds or at idle with the A/C, headlamps and other accessories on.

Some 1998-2001 1.8L Kia Sephia vehicles built between October 1997 and May 2001, and some 2000-2004 1.8L Spectra vehicles built between February 2000 and March 2004, may exhibit battery discharge when operated in high ambient temperatures for extended periods of time at low speeds or at idle with the A/C, headlamps and other accessories on.

Typically, this results in customers reporting an inability to restart the vehicle. To reduce the incidence of customer complaints about battery discharge, the following new part is available: new higher capacity alternator battery insulator pad (P/N QK2AA 18590).

Battery Test Procedure:
Test the battery using the Micro 570 tester; refer to TSB, SST 002 for instructions.

Alternator Installation:
1. Relieve fuel system pressure by removing the fuel pump relay and running the engine until it stops.
2. Write down the preset radio stations, then disconnect the negative battery cable.

Warning: Fuel vapors are highly flammable. Death or serious injury could result if they’re ignited. Make sure there are no open flames or cigarette smoking in the area of the repair. Adequate ventilation is necessary to prevent a buildup of fumes, which could ignite, causing fire or explosion.

3. Remove the engine cover, if equipped.
4. Unbolt the cruise control assembly from the bulkhead and lay it on top of the engine.
5. Remove the engine ground strap.
6. Remove the fuel line using the Quick Connect Fuel Line Tool (refer to TSB Fuel 005).
7. Disconnect the alternator electrical connections.
8. Loosen the pivot bolt and belt tensioner bolts. Do not remove them.
9. Relieve the tension on the drive belt by rotating the adjustment bolt.
10. Remove the drive belt from the alternator pulley.
11. Remove the belt tensioner hardware.
12. Remove the alternator pivot bolt.
13. Remove the power steering hose bracket bolt and nut.
14. Move the power steering hose to obtain best access for alternator removal.
15. Remove the alternator from the engine compartment.
16. Install the new alternator onto the pivot bolt (leave it loose).
17. Rotate the upper bracket into position on top of the alternator.
18. Place the belt tensioner hardware on top of the alternator.
19. Install the tensioner mounting bolt (leave it loose).
20. Inspect the alternator drive belt and replace it, if necessary.
21. Place the alternator belt on the alternator pulley.
22. Adjust the alternator belt by rotating the adjustment bolt. Allowable belt deflection: new belt – 0.23-0.31 in. (6-8mm); used belt – 0.28-0.35 in. (7-9mm).
23. Tighten the tensioner bolt to 14-9 ft.-lbs. (19-26 Nm).
24. Tighten the pivot bolt to 28-38 ft.-lbs. (38-51 Nm).
25. Connect the electrical connectors to the alternator assembly.
26. Reinstall the fuel line, engine ground strap, cruise control assembly, power steering hose brackets, fuel pump relay and engine cover.

Battery Insulator Pad Installation:
1. Disconnect the positive battery terminal from the battery.
2. Install the cutout portion of the new battery cover toward the bottom front of the battery.
3. Reconnect the battery cables, positive cable first.
4. Set the clock and pre-set radio stations.
5. Start the engine and verify proper operation.

Courtesy of ALLDATA.

For information on products offered by ALLDATA, visit www.alldata.com.

You May Also Like

Mullen Announces New CARB Certification

The certification is awarded to vehicle manufacturers who meet specific emissions standards in compliance with CARB regulations.

 Mullen Automotive, Inc., emerging electric vehicle (“EV”) manufacturer, announced certification from the  California Air Resources Board (“CARB”) on the 2025 Mullen THREE, Class 3 all-electric low cab forward chassis truck. The certification is awarded to vehicle manufacturers who meet specific emissions standards in compliance with CARB regulations. The District of Columbia and 14 states, including California, have adopted vehicle standards under Section 177 of the Clean Air Act (42 U.S.C. §7507), which requires additional approvals beyond EPA regulations.

Schaeffler Group USA Expands Product Portfolio

Seventy new parts have been added to the INA, LuK and Schaeffler Bearings portfolios in the first quarter of 2024.

Nissan CVT Clutch Point Relearn Procedure

The Adaptive Shift Control delivers responsive and powerful acceleration.

Hydraulic Power Steering Service Opportunities

Hydraulic power steering is still the choice for some platforms and applications.

Hunter Maverick Tire Changer: 19.5-inch Tire Service

Learn to handle 19.5-inch wheels, which are common on some delivery vehicles, with Hunter’s Maverick tire changer.

Other Posts

Curing Shock, Strut and Suspension Noise

As vehicles age, eliminating noise is Job 1. But ‘noise’ may mean different things to you and your customers.

Diagnostic Test Drive For Drivetrain

A driveshaft center bearing can fail due to the bearing and the rubber isolator.

Mobis Starts Construction of EV Battery System Plant in Spain

The new EV battery system plant will supply Volkswagen and is aiming for mass production by 2026.

Blink Charging UK, Evri Collaborate to Electrify Courier Fleet

EV chargers installed at Rugby enhance Evri’s sustainability efforts, supporting a greener future in parcel delivery across the UK.