LG Opens First EV Charger Factory in Texas

LG Opens First EV Charger Factory in Texas

The Fort Worth factory is currently assembling Level 2 AC chargers with variable current settings for up to 11kW output power.

LG Electronics has inaugurated its first United States-based factory for assembling electric vehicle (EV) charging stations in Fort Worth, Texas. The new factory marks LG’s entry into the U.S. EV charger market and is expected to create new jobs and support the expansion of America’s EV charging infrastructure, the company said.

The opening ceremony was attended by Fort Worth Mayor Mattie Parker, along with LG Electronics senior executives Alec Jang, president of the LG Electronics Business Solutions Company; H.K. Suh, head of LG’s EV Charging business division; and Nicolas Min, president of LG Business Solutions USA.

President Jang emphasized the importance of the EV charger business for LG’s future, stating, “The EV charger business is a growth engine for LG’s future, supporting the company’s transformation into a smart solutions company.” He also expressed LG’s ambition to become a global leader in the EV charging business by leveraging the quality and reliability of its chargers and maintenance services.

The factory has an annual capacity of over 10,000 units and initially occupies about 60,000 square feet of a 100,000-square-foot building, allowing for future expansion. The facility operates using 100 percent green power and is part of LG’s ongoing commitment to Fort Worth, where it has maintained a significant distribution center for three decades.

Michael Kosla, senior vice president of LG Business Solutions USA, noted that the factory marks a significant step in LG’s plan to support the electrification of America. He explained that the Level 2 and Level 3 EV chargers produced at the factory will provide new opportunities for businesses and public places to support EV infrastructure with independently owned and operated charging stations.

LG’s approach involves empowering locations like hotels, restaurants, and municipal buildings to operate their own charging stations, set their own rates and retain profits, addressing the need for hundreds of thousands of new chargers in the U.S., LG said.

The Fort Worth factory is currently assembling Level 2 AC Chargers with variable current settings for up to 11kW output power. These chargers are designed for wall mounting and have been certified to UL2594 and Energy Star standards. Starting in the second quarter, the plant will also assemble LG’s first Level 3 DC Charger, a stand-type model providing fast charging up to 175kW. Additionally, plans for 350kW ultra-fast-chargers are in LG’s product roadmap for the year.

LG’s EV charger launch is part of a broader electrification strategy that includes a suite of products for home electrification, such as HVAC systems, water heaters, energy storage systems and smart appliances. The company also offers the LG ThinQ Energy platform to help customers manage their home’s energy usage, the company said.

You May Also Like

Service Opportunities Still Exist With EVs

Like all ICE vehicles, you need the correct tools, parts and to follow the proper service procedures when servicing EVs. This video is sponsored by The Group Training Academy.

According to a recent survey of shop owners, less than a third of shops work on EVs, due to concerns about battery packs, inverters or other daunting technology. The good news is, though, tomorrow’s electric and hybrid vehicles still offer substantial service opportunities under the car.

Just as with conventional internal combustion engine or ICE vehicles, EVs are subject to the same traffic conditions, potholes, curbs and corrosive environments that can accelerate wear and tear on steering and suspension components. But there are also several other factors with EVs that can make life harder for the suspension.

Green Li-ion Launches Lithium-Ion Battery Materials Plant

The plant is North America’s first commercial-scale plant to produce recycled lithium-ion engineered battery materials.

Autel Energy Europe Releases MaxiCharger Launch Plan

Autel released the MaxiCharger Megawatt Charging System satellite launch plan at the Nordic EV Summit 2024.

U Power Launching Commercial Operation for EV Battery Swapping

Its model for two-wheeled and light four-wheeled EVs is set for a formal commercial rollout in Wuhu, Anhui Province, China.

EVgo Welcomes Scott Griffith to Board of Directors

Griffith previously served as the CEO of the Autonomous Vehicles and Mobility Businesses at Ford Motor Company.

Other Posts

Autel Releases the AC Elite G2 Charging Series 

The charger can be used in various settings, such as public commercial parking areas, residential areas, hospitals and service areas.

Branford Public Schools Award $60M Transportation Contract to Zum

Within five years, Zum will transition Branford to a 100% electric school bus fleet, the first in Connecticut.

Can You Jumpstart an EV?

First thing’s first: Find the LV battery, which could be anywhere in the vehicle.

Mullen Road Tests Solid-State Polymer Battery Pack

The results met or exceeded all requirements targeted for the first drive cycles for energy usage and driving range.